Prize(s) Honorable Mentions
Lighting Design/Product Company Tianjin University
Lead Designers Jiayin Song
Other Designer's names Zhao Wei, Gao Yuanpeng, Liu Yueyang, Ma Xinwei, Du Jianxing
Architecture Company Shanghai ARS Design Firm
Interior Design Company Shanghai ARS Design Firm
Client Asakusa 37 Degrees 1 · Skin Management Customization Center
Photo Credits Zhang Fan
Completion Date September 2023
Project Location Shanghai China
Entry DescriptionIn the lighting design of this project, we adhere to the lighting design concepts of "tranquility", "healing", and "comfort". Through the reasonable use of changes in light and shadow, we have achieved an excellent combination of light, architecture, and interior design, bringing customers a comfortable and relaxing spatial experience.
The reception area is composed of three balanced parts: functional lighting, ambient lighting, and key lighting. Use soft LED pendant lights or wall lights to provide uniform illumination, ensuring a soft visual appearance of the space and avoiding glare. Choose 3000K warm color tones combined with 4000K neutral light to create a warm and friendly atmosphere.
The lighting design of diagnosis and treatment rooms and beauty salons focuses on functionality, aiming to minimize or eliminate the impact and interference of light on the work of beauticians. Use high color rendering LED lighting to ensure bright and uniform light. Due to the fact that this project is located in an underground space, there is no natural lighting entering the interior all year round. In order to provide a more natural lighting experience for the staff and customers working in this space, rhythmic lighting is used in public areas, and the indoor lighting color temperature during the day always matches the outdoor sunlight color temperature.
Sustainability ApproachEnergy saving measures in the project: 1. Adopting an advanced modular intelligent lighting control system, a control strategy combining clock control and manual panel control is adopted to meet the lighting effect realization and diversified control requirements of the project while saving energy and reducing emissions. 2. The project extensively uses high color rendering LED lighting fixtures, which not only ensures the lighting effect, but also reduces energy consumption and operating costs, and minimizes the impact on the environment.
The maximum power density of the public area in this project is 12.6w/m2, the average power density during operation is 9.3w/m2, and the average power density in the working area is 7.5w/m2. Not only lower than Chinese national standards, but also lower than international standards such as the United States and Japan.